This is just a sample of the NJ Home Inspection report. The report is in a booklet type and the report can be sent to your attorney and your realtor, if needed. The report can also be sent via EMAIL if you wish.
Home Inspection
Report

Property Address
104 Kimberly Street
Pompton Plains, New Jersey 07444
Prepared for: John Doe
Prepared by: Foresight Consulting
9 Walnut Court
North Haledon, NJ 07508
973 942-3061
General Information
Report Number : 06-6877
Inspection Date: June 2, 2007
Property Information
Address : 104 Kimberly Street
City, State : Pompton Plains , New Jersey 07444
.
Client Information
Client : John Doe
Address : 12 Mountainview Ave
City, State : Hawthorne , New Jersey 07506
Phone : 973 555-5555
E-Mail : jdoe@ aol.com
Attorney : P. DeMarco, Esq.
.
Inspection Company
Foresight Consulting
Phone : 973 942-3061
E-Mail : foresight1@optonline.net
.
Conditions
Present : Buyer and Agent
Age of Bldg : 1962
Type : Split level Bedrooms: 4 Bathrooms: 2 1/2
Weather : Sunny
Temperature: 68
Foresight Consulting 01-6877
Inspection Report
9 Walnut Court North Haledon, NJ 07508 973 942-3061
Inspection Date: June 2, 2007 Inspector: Keith Salviano NJHI #: GI 369
Submitted for the sole use of:
John Doe
12 Mountainview Ave
Hawthorne, New Jersey, 07506
.
Location of Inspection Site:
104 Kimberly Street
Pompton Plains, New Jersey, 07444
.
An inspection of this single family, split level style structure was conducted on the said date by
Foresight Consulting Services, Inc. Many aspects of the property were inspected, including
structural components, site conditions, utilities, and systems. The report contains observations
concerning each aspect that was evaluated, including some conditions that may require attention.
The report also provides many suggestions and recommendations to help you in maintaining and
improving this property now and in the future. The report is intended to provide you with a better
understanding of the conditions, as observed at the time of the inspection. This report should not be
construed as a warranty or insurance policy, a summary is enclosed, but the report should be fully
read.
Read the entire document carefully. Please contact us if you have questions about any of the details
of this report, or if there is anything you don't understand. Where deficiencies have been indicated
and there is some uncertainty as to what remedial measures may be required, you should call our
office and consult with a competent contractor in a timely manner to determine the scope and cost of
repair. Foresight, would like to thank you for the opportunity of serving you.
IMPORTANT: Scope of Inspection
This report represents an effort to present a fair evaluation of the overall condition of the premises
and systems at the time of the inspection. This report has been prepared to fulfill FCSI's obligations
under the Evaluation Agreement previously agreed to by the parties. The presence or absence of
pests, such as rodents, insects, and wood damaging organisms is not part of this scope of work.
Excluded aspects and inspections are detailed in the signed Evaluation Agreement.
This report offers an opinion only as to those portions of the premises and systems that were easily
accessible and could be evaluated by a strictly visual walk-through inspection. The inspection
procedure and this report complies to the "Standards of Practice" of the New Jersey Home
Inspection Advisory Committee, N.J.A.C. 13:40-15, which defines the duty and the standard of care
to be exercised by this profession in conducting an inspection.
Definitions
Key to Checklist
Acceptable: Item is adequate with no significant defects.
Marginal: Item is generally acceptable, but will require repair or servicing.
Defective: Item is unacceptable or poor and in need of repairs or replacement.
Not Inspected: Item not inspected and or is not in scope of work.
EXTERIOR COMMENTS
Note: Real Estate brokers, owners, buyers, or any parties other than the client who contracted for
and paid for this report are hereby notified that any use of this report by them for any purpose related
to the sale or purchase of this property is not permitted unless the approval of Foresight Consulting
is given as well as the approval of the original client.
Driveway
Acceptable Driveway: Asphalt - The driveway has been capped with another layer of
asphalt. Sealant applied annually for aesthetic purposes and may prolong the life
of this installation.
Walks/Entrance
Marginal City Sidewalk: Concrete - A few of the slabs are not level and can cause a
tripping hazard.
Acceptable Front Walkway: Paving stones
Marginal Front Entrance: Brick and masonry - The front entrance does not have railings
for safety.
Acceptable Garage Entrance: Concrete
Acceptable Walkway: Stepping stone and masonry
Acceptable Patio : Concrete - The patio has been divided with plastic strips as control
joints.
Grading
Acceptable Landscaping: Add some topsoil, seeding and trim shrubs and trees
Acceptable Grading: Minor slope
Acceptable Hose Bibs: Gate
Acceptable Fences: Board on board
Acceptable Walls: Stone
.
Maintaining a slope away from the foundation walls will help lessen water accumulation around the
building during a rainfall and help to insure a dry interior. Depressions can be filled with additional
topsoil, however, under no circumstances should wooden portions of the structure be in contact with
the ground. Grading in areas away from the building was not comprehensively evaluated about
drainage. Underground sprinkler systems are not evaluated. Play Sets, fence ownership, sheds, out
buildings, hot tubs, spas, pools and any electric support is not part of this inspection and outside the
scope of our services.
Shrubs, trees, and vines should be trimmed and prevent contact with the building. This helps to
insure adequate ventilation and prevent excessive dampness that will lead to rot and deterioration.
No investigation or evaluation was performed to locate any above or underground tanks, such as oil,
gas, propane, or chemical tanks, which might be present, or to determine their integrity, condition, or
legality. If an oil tank or tanks are present, it is recommended that the tank or tanks and soil be
tested. Oil tanks have become a major issue lately, so please refer to the later part of this report for
more information.
Deck
Acceptable Material : Pressure treated and PVC
Acceptable Framing : 2x8
Acceptable Foundation: 6x6 Posts on masonry
Marginal Railings/Stairs: Loose spindles
Marginal Electrical : Install GFCI
.
Gutters/Downspouts
Acceptable Gutters: Aluminum
Acceptable Downspouts: Aluminum
The purpose of a gutter system is to collect rain and snow from the roof and divert it away from the
foundation walls. This means keeping gutters cleaned out and sloped, installing splash blocks,
above ground extensions or underground piping and building up the grade so that the roof and
surface water is diverted away from the building. Avoid letting leaders discharge close to the
building as this can increase the chance of water penetration through the foundation.
Debris should be removed periodically to eliminate clogging and overflow. This should be done at
least twice each year.
Fascias/Soffits/Trim
Acceptable Fascias: Aluminum and Wood
Acceptable Soffits: Vinyl
Acceptable Trim : Aluminum capping, vinyl and wood
.
Exterior trim components including those around windows, doors, soffits, and fascias are prone to
opening and weathering at seams and joints. Trim work should be inspected occasionally, caulked,
and sealed as necessary to remain watertight. materials underneath aluminum and vinyl trim was not
visible and condition could not be determined.
Doors/Windows
Acceptable Entrance Door: Composite
Acceptable Utility Door : Wood
Acceptable Rear Door : 2 Glass sliders
.
Acceptable Windows: Double hung - Double glazed
Acceptable Windows: Casement - Double glazed
Acceptable Window: Skylight - Double glazed
.
Windows may require occasional maintenance to insure a tight seal around the framing. Putty or
caulking can be renewed where needed as a normal maintenance task.
The operation and condition of a representative number of doors and windows will be evaluated
during the interior portions of this inspection. An audit of the storms and/or screens was not
conducted. They should be inventoried before closing. The owners should install all the units to aid
this procedure. Dead bolts for the exterior doors are a security feature; cylinder locks for the doors
should be changed.
Siding
Marginal Material: Grooved cedar shakes - The grooved cedar shingle siding seems to
be generally adequate. The siding is very susceptible to cracking and heaving.
The shingles are cedar shingles that are grooved. The cedar shingles require
more attention than a common sanded shingle. The siding is beginning to show
excessive wear on the left side and rear portion of the home and the siding will
require refinishing and some sections replaced. Wood shingles should be
stained on a regular basis for aesthetic reasons. Wood shingles can be painted;
however, paint sometimes peels from wood shingles as moisture escapes from
the shingles. Staining is preferred.
Acceptable Material: Brick veneer - The mortar used in brick work varies, and mortar
repairs are far more common than repairs to the brick itself. When cleaning the
siding, it is recommended that a small area be done first, to ensure a satisfactory
result. The bricks should be chemically cleaned as an alternative to
sandblasting.
.
Maintaining the siding is important to preserve a watertight, draft free home. The siding should not
come in contact with the grading and should be about 8 inches from the soil. If siding touches
grading or masonry, wood rot might exist and replacement of the siding may be required.
.
Acceptable Foundation: Masonry block
Marginal Cracks: A garage wall. The cracking noted is at the front corner where the
downspouts discharges too close and the water might have undermined the
footing and repairs needed.
.
The foundation inspection is limited to the visible areas as observed in date of the inspection some
settlement cracks were noticed. In some cases, vegetation and shrubs obstructions may exclude
certain areas from being viewed. The foundation will be further inspected form the interior, where
accessible.
Roof
Main Roof
Method of Inspection: On roof
Type: Gable
Acceptable Material: Asphalt 3 tab shingle
Approx. Age: The roof is composed of asphalt shingles that are made by impregnating mats of either
organic felt material or fiberglass. The shingles appear to be relatively new and are in acceptable
overall condition.
Acceptable Vents: Metal & PVC
.
It is recommended that the building department be contacted about permits that have been obtained
for the roof and home. This can aid in determining the life expectancy. The building department can
also be addressed on any permits that have been issued for this building. A conventional three tab
shingle roof has an overall life expectancy in the range of 20-25 years, and dimensional shingle roof
about 25-30 years, according to industry standards.
If further evaluation is desired, or recommended by FCS, you should contact a specialized roofing
contractor.
Chimney
Acceptable Material: Brick and masonry
Acceptable Flue / Cap: Clay
Acceptable Flashing: Aluminum
The interior of the flue is not evaluated as part of a standard building inspection. Evaluation of these
areas requires a specialized contractor. Flues should be professionally cleaned. Professional
chimney firms have special equipment capable of inspecting the length of the flue. An inspection of
this type should be considered especially for older homes or those installations with soot build up or
when changing to another type of fuel. The flashings should be periodically inspected during heavy
rainfall and sealed as required to remain watertight.
Masonry chimneys may require repairs to the concrete capping and mortar joints that are exposed to
weather. The need for maintenance of this type is often not apparent from the ground.
Garage
Type of Structure: Attached Car: 2
Acceptable Overhead Doors: Insulated aluminum
Acceptable Opener: Two automatic openers
Acceptable Interior Door:
Acceptable Walls/Ceiling: Drywall
Acceptable Flooring: Poured concrete
Acceptable Electrical: 120 volts outlets and ceiling fixtures
INTERIOR COMMENTS
Living Room
Acceptable Floor : Carpet, over wood
Acceptable Walls/Ceiling: Paint
Acceptable Doors : Hollow core style
Acceptable Windows: Bay
Acceptable Electrical: 120 volts
Acceptable HVAC: Register for heat and AC
.
Dining Room
Acceptable Floor : Wood
Acceptable Walls/Ceiling: Paint
Acceptable Doors : Glass slider to deck
Acceptable Windows: Double hung
Acceptable Electrical: 120 volts
Acceptable HVAC: Heating system register
.
Kitchen
Acceptable Floor : Ceramic tile
Acceptable Walls/Ceiling: Paint and wallpaper
Acceptable Doors : Glass slider to deck
Acceptable Windows: Casement
Acceptable HVAC: Register for heat and AC
.
Acceptable Counter Tops: Granite style
Acceptable Cabinets : Wood
Acceptable Sink/Fixtures: Stainless Steel
Acceptable Electrical : 120 volts outlets and ceiling fixtures
Acceptable Plumbing : Galvanized and PVC
Acceptable Cooking Appliances: Gas countertop with gas wall oven
Acceptable Microwave : Above stove
Acceptable Ventilator : Above stove
Acceptable Dishwasher: Operational
Acceptable Disposal : Switch at countertop
Only the built-in appliances are regularly evaluated as part of a Foresight Consulting inspection.
This normally does not include the refrigerator. Kitchen appliances are complicated mechanical
devices with many internal parts. The appliances were evaluated by operating them, as would a
homeowner and by visual inspection and no disassembly was attempted. Foresight Consulting
cannot predict the useful life of these appliances. It is recommended that you get the manufacturer's
information booklets and warranties, if available.
A home is unique and complex, some insurance companies offer a home warranty for mechanical
and major appliances that can be purchased.
Family Room
Acceptable Floor : Wood
Acceptable Walls/Ceiling: Paint
Acceptable Doors : Hollow core style
Acceptable Windows: Double hung
Acceptable Electrical: 120 volts outlets and ceiling fixtures
Acceptable HVAC: Register for heat and AC
.
Fireplace
Family Room Fireplace
Type: Wood burning
Acceptable Material: Masonry
Acceptable Damper: Metal
Acceptable Hearth : Masonry
.
Installations of this type are not operated to evaluate their performance during an inspection. Flues
should be professionally cleaned on a regular schedule based on the frequency of use. In most
cases, only a limited portion of the flue is visible and surfaces will be obscured by soot. Professional
chimney firms have special equipment capable of inspecting the length of the flue, this is also true
for the main flue. An inspection of this type should be considered especially for older homes or those
installations with excessive soot or creosote build up.
Entrance/Hallway
Acceptable Entrance: Composite style
.
Bedroom Hallway
Acceptable Floor: Wood
Acceptable Walls/Ceiling: Paneling and wallpaper
Acceptable Doors: Hollow core style
Acceptable Electrical: 120 volts
Acceptable Closet: 2 singles
.
Acceptable Stairs Rails: Wood stairs with handrails
.
Smoke detectors and CO monitors are not inventoried nor inspected. They are required safety
devices; however, working units should be maintained at the proper locations on each level. They
should be tested regularly and batteries replaced as required. It is suggested that you check with
local fire code officials about any regulations concerning devices of this type or the installations of
fire extinguishers. It is recommended to locate CO monitors for safety reasons.
Every family should develop and periodically review their personal family fire plan. How do you get
out safely in the event and where do you meet outside the dwelling? You may want to contact your
local fire department for general fire safety information.
Bedrooms
Front Right Bedroom
Acceptable Floor : Carpet
Acceptable Walls/Ceiling: Paint
Acceptable Doors : Hollow core style
Acceptable Windows: Double hung
Acceptable Electrical: 120 volts
Acceptable Closet : Double
Acceptable HVAC: Register for heat and AC
.
Front Left Bedroom
Acceptable Floor : Carpet
Acceptable Walls/Ceiling: Paneling
Acceptable Doors : Hollow core style
Acceptable Windows: Double hung
Acceptable Electrical: 120 volts
Acceptable Closet : Single
Acceptable HVAC: Register for heat and AC
.
Rear Left Bedroom
Acceptable Floor : Wood
Acceptable Walls/Ceiling: Paint
Acceptable Doors : Hollow core style
Acceptable Windows: Double hung
Acceptable Electrical: 120 volts
Acceptable Closet : Walk In
Acceptable HVAC: Register for heat and AC
.
Master Bedroom
Acceptable Floor : Carpet, over wood
Acceptable Walls/Ceiling: Paint and wallpaper
Acceptable Doors : Hollow core style
Acceptable Windows: Double hung
Acceptable Electrical: 120 volts
Acceptable Closet : 2 Doubles, 1 walk-in
Acceptable HVAC: Register for heat and AC
.
Bathrooms
Main Bathroom
Acceptable Floor: Ceramic tile
Acceptable Walls/Ceiling: Paint and tile
Acceptable Door: Hollow core style
Acceptable Electrical: 120 volt GFCI
Acceptable Counter/Cabinet: Wood
Acceptable Sink/Basin: 2 wash basins and cabinets
Acceptable Faucets/Traps: PVC trap, metal drain
Acceptable Toilet: Porcelain
Acceptable Tub/Surround: Fiberglass tub and ceramic tile surround
Acceptable Tub/Shower Diverter: Operable
Acceptable Ventilation: Exhaust fan
Acceptable Heat Source: Register for heat and AC
.
Half Bathroom
Acceptable Floor: Ceramic tile
Acceptable Walls/Ceiling: Acoustical tile and paint
Acceptable Door: Hollow core style
Acceptable Window: Double hung
Acceptable Electrical: 120 volts outlets and ceiling fixtures
Acceptable Sink/Basin: Pedestal
Acceptable Faucets/Traps: PVC
Acceptable Toilet: Porcelain
Acceptable Heat Source: Register for heat and AC
Acceptable Ventilation: Exhaust fan and window
.
Master Shower Bathroom
Acceptable Closet: Single small
Acceptable Walls/Ceiling: Paint and tile
Acceptable Door: Hollow core style
Acceptable Window: Double hung
Acceptable Electrical: 120 volts outlets and ceiling fixtures
Acceptable Floor: Ceramic tile
Acceptable Counter/Cabinet: Wood
Acceptable Sink/Basin: Acrylic
Acceptable Faucets/Traps: PVC trap, metal drain
Acceptable Toilet: Low Profile
Acceptable Shower/Surround: Fiberglass pan and ceramic tile surround with glass doors -
The shower is an installation which is more prone to leakage than other
bathroom units. When leakage occurs, repairs can be significant. The shower
was operated for an extended period, and those areas which might be affected
were inspected for indications of leakage.
Acceptable Shower Diverter: Operable
Acceptable Ventilation: Exhaust fan and window
Acceptable Heat Source: Register for heat and AC
.
Surfaces subjected to wet conditions should be well caulked, grouted, and sealed as necessary to
maintain them in a waterproof condition. This is important maintenance and will help to prevent
leaks and deterioration of materials behind these surfaces. The water was only activated for a brief
period and severe damage to underlying surfaces may occur in a relatively short period. The tub
and or shower stall should be re-inspected prior to obtaining your purchase because leaks can
develop in a very short period.
Glass enclosures are often for tubs and showers. Glass surfaces along with wet and slippery floors
could obviously be hazardous, and this aspect should be considered about such installations.
Ground Fault Circuit Interrupter (GFCI) electrical outlets are a significant safety improvement. They
are required for bathrooms, kitchens, laundry, and outside outlets.
Attic/Insulation
Method of Inspection: Inside the attic
Acceptable Roof Framing: 2x8
Acceptable Sheathing: Roof board
.
Acceptable Ventilation: Gable, ridge, and power ventilator
Acceptable Insulation: Fiberglass
Acceptable Insulation Depth: 6"
.
Water penetration: No
.
The wall voids are inaccessible. The amount and type of wall insulation, if any, could not be
determined. Present recommended energy efficiency standards call for at least six inches of
insulation above the ceiling.
Water penetration through the roof or flashings is dependent on both weather and seasonal
conditions. Signs of water penetration during dry weather is often difficult to observe or nonexistent.
Previous water penetration also may leave visible stains that do not indicate present leakage.
As a note, inspect attic, storage, and basement areas for leaks and condensation prior to purchase
and make sure that the insulation is not against the electrical boxes. The presence or absence of
pests, such as wood damaging organisms, mice, rodents, or insects was not performed. The owner
or tenant should be asked about pest infestations of any kind.
Basement
Acceptable Foundation: Masonry block
Acceptable Cracks : A few vertical cracks
Acceptable Floor / Slab: Concrete
Acceptable Girder : 3 2x10's
Acceptable Joists : 2x8
Acceptable Posts : Lally columns
Acceptable Electrical: 120 volts
Acceptable Sump Pump: Submerged
.
Water penetration: No
.
As a note, proper grading is an important consideration when dealing with dampness or wet
basements. Efflorescence and water stains noted on the foundation walls may indicate a moisture
problem. Predictions about water penetrations are based on indications and conditions at the time of
the inspection. Seasonal conditions often cannot be accurately forecasted based on a single
inspection. It is highly advised that you contact the occupants or owner before obtaining your
procurement. You should obtain disclosure and or history information regarding any water
penetration. This can provide more information concerning any previous incidents or water
penetration. There are occasional instances where the weather conditions conspire to create
exceptional events, especially when melting ice seals the ground and excessively high water table.
These conditions can cause water penetrations in any basement or crawlspace and should be
addressed. Moisture related conditions, whether at the interior of exterior of the building, client
should consult a qualified mold testing company prior to close.
Heating
Heating System
Manufacturer: Rheem Description: The portions of the combustion chambers which are visible
appeared to be in serviceable condition at the time of the inspection. Operating and safety controls
were installed and controls were not tested. Some corrosion was observed, however, it appears to
be within normal limits for he age of the unit. The sealant around the flue transition piece should
always be well caulked. The ductwork was not inspected for dirt, leaks, mildew or dust. The air filter
should be changed or replaced every 30 to 60 days to provide air circulation and help protect the
system. A furnace of this type usually has an overall life expectancy 20 years prior to the need for
replacement.
.
Type of Unit : Hot Air BTU's: 120,000
Zone : 1 Age/Year: 1997
Fuel Type : Natural gas
Acceptable Operation : Appears functional at time of inspection
Acceptable Exchanger: 5 Burner
Acceptable Motor : Blower
Acceptable Distribution: Metal and flex ductwork
Acceptable Draft Control: Automatic
Acceptable Flue Pipe : Single wall
Acceptable Safety Device: Limit switches
Acceptable Filter : Disposable
Acceptable Thermostat: Programmable
Acceptable Humidifier : April-Aire
.
Internal access in the unit is limited and this evaluation is based on external visual inspection only.
Automatic safety controls were not operated nor evaluated and no components were disassembled.
Thermostatic controls were not checked for accuracy and the safety or shutdown systems are not
tested. Only the main unsecured access panels were opened. The heat exchanger is mostly hidden
from view; it cannot be fully examined and the condition can not be determined without being
disassembled. Your fuel supplier or a heating contractor should perform a more rigorous inspection
and maintenance. A gas leak test was not performed. It is recommended to locate a CO monitor for
safety features.
It is recommended that the equipment be inspected, cleaned, and maintained by a qualified
contractor to insure operation. The company should secure a maintenance policy before obtaining
the residence.
Air Conditioning
Compressor AC System
Manufacturer : Rheem
Approx. Age : 1997 Size of Unit: 42,000
Acceptable Operation : Appears serviceable - The compressor unit is located outside the
home was inspected externally. The freon lines require to be insulated and a
disconnect switch is required for servicing the unit. The overall life expectancy of
the unit of this type is approximately 15 years.
Acceptable Disconnect : Breaker disconnect
Acceptable Refrig. Lines: Serviceable condition
Power to Unit: 240 volts Temp.Differential: Not tested
.
Evaporator Location: Furnace - The evaporator unit is located inside the ductwork above the
furnace. The ductwork is the same as the furnace and the evaporator unit located inside the plenum
can not be seen. Cool air was noted, however, the AC system should be activated during warmer
days and for a more prong period. The unit can be evaluated to determine if the home is adequately
cooled.
Manufacturer : Rheem
Approx. Age : 1997 Size of Unit: 42,000
Acceptable Distribution: Metal and flex ductwork
Acceptable Motor : Same as heating system
Acceptable Condensate: Electric pump, PVC - The condensed water from the evaporator
discharges into a small reservoir with a pump. The pump is relatively inexpensive
and is easily replaced and is prone to failure. The pump discharges should be to
the exterior. The system should be inspected, cleaned and maintained.
Acceptable Thermostat: Programmable
.
Plumbing
Supply Line: Municipal source Material: Copper
Acceptable Main Shutoff : Basement
Acceptable Water Lines : Copper
Acceptable Drain Pipes : Galvanized, cast iron, copper and PVC
Acceptable Main Cleanout: Accessible
Acceptable Vent Pipes : PVC, copper, and galvanized
.
Water Heater
Acceptable Manufacturer: Kenmore
Type: Natural gas Gallons : 50
Year: 2002 Life Exp.: 7-10 years
Acceptable Flue Pipe : Single wall
Acceptable Safety : PVC
.
Most piping in the building is concealed in walls, ceilings, underground, and could not be visually
inspected. Shut off valves other than the fixtures themselves were not operated because they are
operated infrequently and may leak. Globe valves should not be operated on a continual basis
because they tend to leak more than a common ball valve. The safety valves and controls are not
tested because they might not reset. The municipality should be addressed about the facilities
associated with this building. Water temperature should be maintained at a reasonable level.
Excessive temperature is hazardous, inefficient, and tends to reduce the useful life of the water
heater. It is recommended that you adjust the temperature once you move in, to the level you desire.
Foresight Consulting wishes to remind you, every home requires a certain amount of ongoing
maintenance, such as unclogging drains, servicing heating and A/C system, water heater, etc. This
home will be no exception and it is suggested that you budget for regular maintenance and repairs.
The drain lines do clog or drain slowly over time because of the use and will require maintenance
and professional cleaning. The owner or occupant should be addressed on the plumbing repairs,
service, and cleaning of the waste system.
Laundry Connections
Acceptable Washer Connection: Single lever
Acceptable Washer Drain: Drains to laundry tub
Acceptable Electrical: 120 volt GFCI
Acceptable Tub Drain: PVC and metal
.
Acceptable Dryer Vent : Metal flex
Acceptable Dryer Supply: Black iron and metal flex pipe
.
Any laundry appliances that may be included in the sale are normally not evaluated within the scope
of an inspection. The condition and future life expectancy of such units cannot be predicted or
guaranteed. The dryer vent pipe should be cleaned routinely as recommended by the appliance
manufacturer.
Electrical
Acceptable Serviceline: Overhead conduit
Garage Electrical
Acceptable Manufacturer : Square D
Amps: 200 Volts: 240/120
Main Disconnect: Yes The main disconnect is present, but was not operated.
Acceptable Breakers: Copper and Aluminum
Acceptable Ground : Present at all components necessary
Acceptable Outlets : Ground Fault Circuit Interrupter (GFCI) electrical outlets are a
significant safety improvement. They are required for bathrooms, kitchens, and
outside outlets.
Acceptable Wire Material : Copper
Acceptable Aluminum Wire: Entrance only
Acceptable Cable Type: Romex and BX
.
The wiring configuration from the main and sub-panel system to the outlets, switches, and
appliances were not tested. Almost all the wiring is concealed in walls, ceilings, and cannot be
visually inspected. All extension cords should be removed. A representative number of outlets,
fixtures, and switches were operated.
The main service line and major appliance feeds are often aluminum wire, this is acceptable and a
standard practice.
A ground wire across water meters, hot water sources, and an exterior rod is now a recommended
practice.
.
Please use the enclosed "Preclosing Inspection Checklist" to help you at your final inspection before
taking possession of the property. It is recommended that you compare the condition of the building
to the described condition in this report and the preliminary report. Please contact us if you notice
any discrepancies. Remember, however, that certain aspects may have changed subsequent to the
inspection and could be different from noted in this report. The municipality should be addressed
about the facilities associated with this building.
A summary may not represent all items that may be of concern to you. Please read and review the
entire report including important limitations of this inspection.
Special Concerns
ENVIRONMENTAL HAZARDS:
This inspection is undertaken for the purpose of determining the condition of the building as constructed. It
can not be determined what materials may have been used in the construction of this building, or if
environmental hazards, such as electromagnetic radiation, lead, carbon monoxide, formaldehyde, Radon,
fungi, mold, playground equipment, etc. may be present. Hazardous materials such as asbestos will be
pointed out where the inspector is reasonably certain of their presence. However, no attempt to analyze any
of the constituents of construction materials, floor tiles, paint or decorating materials can be undertaken.
Please be aware that in light of current issues on mold/fungi in buildings, any comment in this report that
indicates water damage, water stains or plumbing leaks should be considered as possible areas of mold
growth. Mold and asbestos testing is not included in this inspection process
UNDERGROUND STORAGE TANKS:
No deliberate investigation was performed to locate any above or underground tanks, such as oil, gas or
chemical storage tanks, which might be present, or to determine their integrity, condition or legality. This has
become an specially significant issue considering recent changes to the New Jersey Spill Compensation and
Control Act. Usually it places the responsibility for any discharge of hazardous substance, including heating
oil and other petroleum products, past or present, on the owner of the property when discharge is discovered.
That responsibility can be reduced or eliminated by performing an adequate oil tank inspection and soil testing
in this regard at the time the property is acquired. Under no circumstances should this report be construed to
address this topic in any thorough or exhaustive manner, or to certify this property to be free of contamination
due to any prior or ongoing discharge or petroleum or other chemicals. Above ground storage containers are
also beyond the scope of the inspection.
RADON TESTING:
If you have not contracted for a radon test with a NJ DEP certified tester, we recommend that you consider
testing. Radon is considered a serious health hazard. Foresight Consulting can provide RADON TESTING
for this building, if desired. If you have contracted for a radon test with us, the results will be reported
separately. Further information is available by calling the New Jersey DEP Radon Hotline: 1-800-648-0394.
WOOD DESTROYING INSECTS:
The visible damage found may not show live activity, however, when damage is found, it should be
understood that some degree of damage is hidden and live activity could be present in the structure. The
building has closed walls, fixed, and insulation in the lower and upper levels of the structure, and there is
limited, to no accessibility to all wood framing for inspection. It should be understood that even though the
finished walls, ceilings, and floors may no show evidence, there could be hidden damage concealed in these
areas. This report is indicative of the condition of the structure on the date of the inspection only and is not to
be construed as express or implied warranty or guarantee against latent, concealed or future wood destroying
insect infestation and defects. If the structure has been treated, we recommend obtaining records relating to
prior inspections also contact treating company to transfer warranty.
If you have any questions or concerns regarding these issues, please contact us for assistance. Also discuss
the environmental issues and the usual precautions with your attorney.
FORESIGHT CONSULTING CAN HELP ARRANGE FOR RADON MITIGATION, SEPTIC, MOLD, OIL TANK, ASBESTOS, LEAD, PAINTED SURFACES, AND WATER TESTING. PLEASE CONTACT US FOR FURTHER INFORMATION IN THIS REGARD.
Preclosing Inspection Checklist
A preclosing check list is enclosed for a walk through to help with inspecting the building
John Doe
104 Kimberly Street
Pompton Plains, New Jersey, 07444
. Prior to obtaining the home, you should return to the property and conduct a Preclosing Inspection to confirm the condition of the property. Use the same
1 Are the windows operable? Yes [ ] No [ ]
2 Are there any loose cables or uncovered boxes? Yes [ ] No [ ]
3 Are there any broken windows? Yes [ ] No [ ]
4 Is the security/intercom/vacuum operable? Yes[ ] No [ ]
5 Have the handrails been removed or loose Yes [ ] No [ ]
These are just a couple of the many items that will be listed.
Signature and Date of Preclosing Inspection _______________________________________________________
Summary
Walks/Entrance
City Sidewalk: Concrete - A few of the slabs are not level and can cause a tripping hazard.
Front Entrance: Brick and masonry - The front entrance does not have railings for safety.
Deck
Railings/Stairs: Loose spindles
Electrical : Install GFCI
Siding
Material: Grooved cedar shakes - The grooved cedar shingle siding seems to be generally
adequate. The siding is very susceptible to cracking and heaving. The shingles are cedar
shingles that are grooved. The cedar shingles require more attention than a common sanded
shingle. The siding is beginning to show excessive wear on the left side and rear portion of the
home and the siding will require re-finishing and some sections replaced. Wood shingles should
be stained on a regular basis for aesthetic reasons. Wood shingles can be painted; however,
paint sometimes peels from wood shingles as moisture escapes from the shingles. Staining is
preferred.
Foundation Cracks: A garage wall. The cracking noted is at the front corner where the downspouts
discharges too close and the water might have undermined the footing and repairs needed.
Foresight Consulting Home Inspections performing detailed NJ home inspections for 22 years and now a 2nd Generation.
|